Planned Stoppages

Starts At: Bridge 10-Junction Bridge Ends At: Bridge 2 High Level Bridge Up Stream Winding Hole: n/a Down Stream Winding Hole: n/a ADVICE (8am-2pm Friday 14 December 2018  Original message: Please be aware that, weather dependant, a large vessel will be being towed down the Gloucester & Sharpness Canal on Friday 14th December between 08:00 and 14:00. […]
Read more

New Junction Canal

Planned Stoppages

Don Aqueduct Up Stream Winding Hole: Junction to the Aire & Calder Navigation Down Stream Winding Hole: Junction to the Stainforth & Keadby Canal, approx. 500m south of the Don Aqueduct RESTRICTION (7am Monday 17 December until 6pm Tuesday 18 December 2018 18:00Type:  Original message: Contractors will be performing roped-access inspections of the Don Aqueduct. […]
Read more

Grand Union Canal

Planned Stoppages

Bridge 209B, Augustus Close ADVICE (Thursday 13 December until Friday 14 December 2018) Contractors will be undertaking diving inspection works for a below water conditional assessment survey of the offside canal wall at the Old Nestle factory site just south of the railway bridge crossing. Expect minor delays along the navigation as boaters are advised […]
Read more

Grand Union Canal

Planned Stoppages

Bridge 68, Galleon Bridge ADVICE (Monday 17 December until Monday 31 December 2018) Contractors will be undertaking mooring landing installation works along the offside bank. The canal navigation will remain open, although boaters are advised to pass by the works slowly and carefully The canal towpath is unaffected by the works
Read more

Black Sluice (South Forty Foot)

Planned Stoppages

Hubbert's Bridge Slipway & navigation channel (Black Sluice aka South Forty Foot) NAVIGATION CLOSURE (until 6pm Sunday 31 March 2019) NAVIGATION CLOSURE NOTICE FROM THE ENVIRONMENT AGENCY. Please note, this closure relates to Hubbert's Bridge Slipway and navigation channel - Black Sluice (aka South Forty Foot) - and NOT the River Witham. Please be aware […]
Read more

Stainforth & Keadby Canal

Planned Stoppages

Bridge 83, Keadby Rail Drawbridge RESTRICTION (8am Monday 10 December until 5pm Sunday 23 December 2018) Network Rail contractors will be working from a floating pontoon to take core samples of the bridge foundations. Boaters and other navigation traffic may experience up to a 20 minute delay to enable the pontoon to move out of […]
Read more

Nottingham & Beeston Canal

Planned Stoppages

Bridge 1c, Lms Main Line No 25 Up Stream Winding Hole: Old Basin at the Premier Inn, 100 m north of the bridge Down Stream Winding Hole: River Trent at Meadow Lane Lock NAVIGATION CLOSURE (8pm Saturday 15 December until 8am Sunday 16 December 2018) As part of the Bridge replacement works, J Murphy & […]
Read more

Kennet & Avon Canal

Planned Stoppages

Starts At: Lock 15, Semington Lock Ends At: Lock 16, Harris Lock Up Stream Winding Hole: Bridge 150 Sells Green Swingbridge Down Stream Winding Hole: Whaddon 65ft Winding Hole Update on 06/12/2018: Following the inspection it has been found that the bottom approach chamber wall support has collapsed. Consequently the lock will remain closed until further […]
Read more

River Nene

Planned Stoppages

Wansford Pumping Station RESTRICTION (Monday 3 December until Monday 17 December 2018) Contractors, on behalf of Anglian Water will be carrying out piling works at the front of the intake. The works will involve using a modular pontoon, with on-board knuckle crane and air hammer. The outer edge of the pontoon will be positioned in […]
Read more

River Ouse

Planned Stoppages

Scarborough Rail Bridge RESTRICTION (8am Monday 3 December 2018 until 5pm Monday 11 March 2019) Work will be taking place on behalf of York City Council on Scarborough Rail footbridge. They will be replacing the existing footbridge. This will require restrictions to river traffic as follows: 3rd to 7th December 2019. 2 days North span closed, […]
Read more

Sheffield & Tinsley Canal

Planned Stoppages

Tinsley Sanitary Station ADVICE (7am Monday 10 December until 5pm Friday 21 December 2018) Refurbishment works are taking place at Tinsley Sanitary Station. Contractor will phase the overall works starting on either the Ladies or Gents shower and toilet areas Throughout the works the unisex use of the Gents/Ladies facilities will be in operation. In […]
Read more

Aire & Calder Navigation Main Line

Planned Stoppages

Starts At: South Accommodation Bridge Ends At: Lock 1, Leeds Lock RESTRICTION (9am Monday 10 December until 5pm Sunday 23 December 2018) There will be a navigation restriction in place in order to facilitate the contractor, Citu. They will be lifting a new footbridge into place over the river and waterside path upstream of South Accommodation Bridge […]
Read more

Ure Navigation

Planned Stoppages

Starts At: Aldwark Footbridge Ends At: Aldwarke Toll Bridge ADVICE (9am Thursday 13 December until 5pm Sunday 16 December 2018) Aldwark Activity Centre will be undertaking safety and rescue training. The training will involve safety and rescue exercises that may involve exceeding the speed limit. All exercises will be restricted to the stretch of river […]
Read more

Sheffield & Tinsley Canal

Planned Stoppages

Tinsley Sanitary Station ADVICE (7am Monday 10 December 2018 until 5pm Saturday 19 January 2019) Update on 30/11/2018: Please note the changes to the arrangements for the refurbishment works. Please note that these refurbishment works are now being completed in two phases as below: Phase 1 - 10.12.18 to 21.12.18 Male Shower Male Toilet Male […]