Yarm Railway Bridge Inspection
Yarm Rail Viaduct
RESTRICTION (8am-6pm Saturday 30 July 2022)
An inspection of the bridge will be carried out using divers.
Can skippers of all crafts, please slow down and approach the area with caution when approaching the bridge as divers will be in the water.
Please be prepared to stop if the safety boat requests so that divers can move to a safe location.