Railway Bridge 89A, Nantwich
RESTRICTION (8am-5pm Wednesday 26 July 2023)
Please be advised third-party contractors will be onsite to carry out a detailed inspection of bridge, Railway Bridge 89A on the Shropshire Union Canal.
To be able to inspect the bridge, a pontoon and scaffold tower will be in place.
We politely request all customers to approach the area with caution and be prepared to stop to allow the pontoon and equipment to be moved out the way for safe passage.
We anticipate a wait of no longer than 30 minutes. Please listen to any advice that may be given by the onsite banksmen and to take note of the signage onsite.