Sheffield & Tinsley Canal

Date:
Time: -
Planned Stoppages

Tinsley No.9 (Plumpers) Lock & Lock 7/8 Bottom Gate – Closure
Starts At: Tinsley No.9 (Plumpers) Lock
Ends At: Tinsley No.7/8 (Deep) Lock

NAVIGATION CLOSURE (8am Wednesday 15 June until 4pm Friday 17 June 2022)

The navigation will be closed to allow the excavation and installation of a new section of pipework adjacent to the existing wash wall.  This will be installed from the existing Tinsley pump house to Lock One.