Bridge 14, Radcliffe Viaduct
RESTRICTION (Wednesday 19 July 2023)
Third party contractors, Inspire Structures Ltd, will be carrying out a diving survey of Radcliffe viaduct, bridge 14 on the River Trent on 19th July.
The diving survey is required to assess the underwater condition of a railway bridge. A Rib boat will be required by the divers.
There may be delays of up to 30 minutes for passing craft to allow the diving team and craft to safely move out of the way.
Passing craft should navigate the works location slowly, with caution and in single file.