Mooring Suspension and Towpath Closure
Starts At: Bridge 164, Tom Rolt Bridge
Ends At: Bridge 164A, Footbridge
TOWPATH CLOSURE (8am Monday 23 May until 5pm Saturday 4 June 2022)
Please be advised, due to the installation of 3 charging points, the towpath will be closed between bridge 164, and bridge 164A on the Oxford Canal.
The moorings will also be suspended for the duration of these works.