Altham Embankment, near Bridge 118
Starts At: Bridge 117, Clough Bank Bridge
Ends At: Service Crossing, Altham Bridge 118
Up Stream Winding Hole: Above Bridge 118
Down Stream Winding Hole: Controlled access into stoppage area to wind at Llough Bank Waterside above Bridge 117
NAVIGATION CLOSURE (8am Monday 7 February until 4pm Friday 8 April 2022)
A stoppage is required to carry out numerous Leak and Bank Repairs along length of Embankment.