Bingley 5 Rise towpath upgrade
Starts At: Bridge 200, Bingley 5 Rise Swing Bridge
Ends At: Airedale Boatclub Swingbridge 199A
TOWPATH CLOSURE (8am Monday 4 September until 6pm Saturday 16 September 2023)
Contractors will be on the towpath between Airedale Boat Club Swing Bridge and Bingley 5 Rise Locks to undertake upgrades.
A diversion will be set up to by-pass the closure. Boaters and other navigation traffic using the 5 Rise Swing Bridge and Top Lock may be affected. We ask that everyone cooperates with request from staff on site.