Kennet & Avon Canal

by

Start date: October 26, 2022
End date: December 18, 2022
Time: 12:00 am – 12:00 am
Planned Stoppages

Starts At: Bridge 27, Padworth Swingbridge
Ends At: Bridge 25A, Ufton Swingbridge

NAVIGATION CLOSURE (8am Monday 7 November until 6pm Friday 16 December 2022)

Please be advised, as part of the winter works planned on Towney Lock (97) between 7th Nov 22 and 16th Dec 22, we will be looking to move all craft out of the section highlighted below by the 6th November 22.

The engineers carrying out the works to replace the top and bottom gates will be locking Padworth Swingbridge (27) and Ufton Swingbridge (25A) to stop any boats from accessing the area.

Keeping the area clear gives us the ability to do the work that we need.


Advert
Get Towpath Talk newspaper delivered every month. Click here to subscribe.

Read Towpath Talk FREE online here.


Sell your boat here.

Article Tags:

About the Author