Planned Stoppages

Slaithwaite Reservoir – Public footpath closure of the north side of the reservoir
Starts At: Bypass channel bridge
Ends At: Inlet Control Structure

TOWPATH CLOSURE (8am Monday 15 November until 6pm Monday 17 January 2022)

The public footpath of the north side of Slaithwaite Reservoir parallel with Longlands Road and adjacent to the channel will be closed from the 15th November for approximately 8 weeks.

This is to undertake bypass channel improvements and wll include dredging the bypass channel in specific locations, disposing of dredged material on the south face adjacent to the reservoir, raising walls in specific locations reusing or sourcing new stones to match the existing ones and rebuilding the weir and installing new stop plank channels.

These works will be carried out by Third Party Works contractors