Bridge Inspection
Bridge 2, Railway
RESTRICTION (8am-6pm Monday 27 February 2023)
An inspection of bridge 2 , Railway bridge is taking place from scaffold on a floating pontoon.
Skippers should slow down when approaching the bridge and be prepared to stop if requested.
Boaters have priority but may be requested to stop for up to 20 minutes whilst the pontoon moves out of the way.