48 Hour navigation Closure
Lock 90, Norwood Top Lock
Up Stream Winding Hole: 200m above LK 90
Down Stream Winding Hole: Between LK 91-92
NAVIGATION CLOSURE (8.30am Tuesday 27 June until 5pm Wednesday 28 June 2023)
A stoppage is needed to replace the snapped offside ground paddle post and reconnect top gate centre Paddles., This will require the Lock head to be dewatered and so stop plank installation will be required to carry out the repairs.