Towpath Closure (Diversion in place) & Mooring Suspension
Starts At: Bridge 95A (Railway)
Ends At: Bridge 96, Watling Street (V4)
Update on 29/01/2024:
Contractors on behalf of National Grid will be replacing a HV cable located in the rear verge of the towpath. The towpath will be closed adjacent the railway bridge (Br95A). A towpath diversion will be available via Watling St (A5) and Simpsons Rd for onward travel