Bridge 2C
RESTRICTION (Tuesday 13 June 2023)
Third party contractors, AMEY, will be carrying out an inspection on Rail Bridge 2C on the Erewash Canal on Tuesday 13th June.
The bridge inspection will be undertaken from a small pontoon with aluminium scaffold tower, or from a ladder.
There may be delays of up to 30 minutes for passing craft to allow contractors to move their pontoon if it is restricting the navigation. Passing craft to navigate the location slowly, with caution and in single file.
Please follow any instructions on site.