Stoppages & Restrictions

Figure of Three Bottom Lock to Bridge 27, Horbury Basin
Starts At: Lock 24, Figure Of Three Bottom
Ends At: Bridge 27, Horbury Basin

Update on 31/03/2022:

The towpath repair works are still ongoing due to the scale of the work needed to be done to repair the towpath.

We will update the notice when we have further information.

TOWPATH CLOSURE (1pm Monday 21 February until 4pm Friday 25 March 2022)

Due to recent flooding the towpath between Figure of Three Bottom Lock and Horbury Basin is closed to ensure the safety of the public.

The flooding has washed out the towpath below the lock exposing an electricity cable.

Once remedial actions have been agreed a repair will be undertaken and the towpath reopened.  At this time, it is difficult to give a time scale for when the towpath may reopen but the aim is to undertake the repair and reopen as soon as is practical.