Aylesbury Arm (Grand Union Canal)

by

Start date: November 6, 2023
End date: December 15, 2023
Time: 12:00 am – 12:00 am
Planned Stoppages

Lock 15, Osier Bed Lock
Up Stream Winding Hole: Winding Hole, Red House. Downstream of Bridge 9
Down Stream Winding Hole: N/A

NAVIGATION CLOSURE (8am Monday 6 November until 4pm Friday 15 December 2023)

After our initial investigation into this work, it has become apparent that more work will need to be done before we install the bottom gates.

We will need to do a further investigation which will only be possible once a dewater has been done. Unfortunately, this means we will need to add an additional two weeks onto this work which means we will be on site from the 6th November 2023 through to the 15th December 2023.

Original message:

A stoppage is required to replace the top end single and bottom end mitre gates. 


Advert
Get Towpath Talk newspaper delivered every month. Click here to subscribe.

Read Towpath Talk FREE online here.


Sell your boat here.

Article Tags:

About the Author