Lock 11, Ferrybridge Flood Lock
Update on 06/12/2023:
The faulty sensor on the lock gate has been successfully replaced and the lock is now operational.
However, river levels have risen and the lock is now closed for navigation use until river levels drop.
Please refer to current notice on river conditions and which flood locks are open and closed.