Aire & Calder Mainline/Wakefield Branch/Bank Dole Cut

by

Date: January 29, 2024
Time: 12:00 am
Stoppages & Restrictions

Intersection of: Lock 9, Castleford Junction Lock to Lock 11, Ferrybridge Flood Lock on Aire & Calder Navigation Main Line and
Bank Dole Lock (Lock 5) to Bank Dole Lock (Lock 5) on Bank Dole Cut and
Leeds Dock Flood Gates to Leeds Dock Flood Gates on Clarence Dock

Update on 29/01/2024:

River levels are responding to recent rainfall

The following flood locks/gates are closed and navigation restricted:

Leeds Dock (Clarence Dock) Flood Gates

Ferrybridge Flood Lock 

Castleford Flood Lock

Broadreach Flood Lock 

Bank Dole Flood Lock

Please check the Strong Stream Warning board and marker at each flood lock before entering the river section of navigation. 

This notice will be regularly updated as water level conditions change.


Advert
Get Towpath Talk newspaper delivered every month. Click here to subscribe.

Read Towpath Talk FREE online here.


Sell your boat here.

Article Tags:

About the Author