Past Stoppages & Restrictions Listing

Old West River – Great Ouse

Date: February 9, 2024
Stoppages & Restrictions

Between the Old Pump House and Lazy Otter

Updated on 8/2/2024:

The navigation reported obstruction notice issued 7 Feb 24 for floating debris on the Old West towards The Old Pump House has been rescinded. Boating Customers have confirmed the floating debris has now broken up.

River Nene

Date: February 6, 2024
Stoppages & Restrictions

Wadenhoe Water Point

Navigation Advisory Notice issued on 30 January 2024 regarding Wadenhoe Water Point on the River Nene, this is now rescinded as repairs have been carried out.

Sheffield & South Yorkshire Nav

Start date: February 5, 2024
Est. end if know: February 6, 2024
Stoppages & Restrictions

Barnby Dun Vegetation Clearance
Starts At: Access 1, Carpark Barnby Dun
Ends At: Access 2, Carpark Barnby Dun

RESTRICTION (8am Monday 5 February until 6pm Tuesday 6 February 2024)

OCS Group Ltd are carrying out vegetation clearance in the area surrounding the overhead powerlines on behalf of National Grid.

There maybe a delay of up to 15 minutes for towpath users whilst equipment is moved out of the way.

Please follow any instruction from staff on site.   

River Nene

Start date: February 5, 2024
Est. end if know: February 9, 2024
Stoppages & Restrictions

Islip Lock and Alwalton Lock

ADVICE (Monday 5 February until Friday 9 February 2024)

Please be aware that Grab Chains at Islip and Alwalton Locks are damaged. Works are due to take place between the dates stated above to reinstate the damaged chains.
During the works, please take direction from the on-site contractors.

Monmouthshire & Brecon Canal

Date: February 4, 2024
Stoppages & Restrictions

The event will use a section of towpath between Brecon Theatre and Talybont Railway Bridge.
Starts At: Bridge 167, Dadford’s Bridge
Ends At: Talybont Raiway Bridge

EVENT (6-10am Sunday 4 February 2024)

Please be advised that a long-distance run/walk has been organised by Run Walk Crawl on Sunday 4th February 2024.

The event will use a section of towpath between Brecon Theatre and Talybont Railway Bridge.

The towpath will remain open although there may be slight delays. 

Please proceed with care and follow the guidance of the stewards.

River Nene

Date: February 1, 2024
Stoppages & Restrictions

Irthlingborough Lock

Update 1/02/2024:

Further to our Navigation Advisory Notices issued 31 January 2024 regarding a log in Irthlingborough Lock Gates and a Tree in Navigation upstream of Irthlingborough Lock, these have been removed and the notices are now rescinded.

Ashby Canal

Date: February 1, 2024
Stoppages & Restrictions

Near Jackson’s Bridge 41

Update on 01/02/2024:

This tree has now been removed and the navigation is clear. Boaters can proceed as normal.

Trent & Mersey Canal

Date: February 1, 2024
Stoppages & Restrictions

Flint Mill, Middlewich
Starts At: Bridge 173
Ends At: Bridge 175, Flint Mill

NAVIGATION CLOSURE (8am-4pm Thursday 1 February 2024)

Please be advised navigation will be closed on Thursday 1 February between Bridge 173 and Bridge 175, Flint Mill on the Trent & Mersey Canal to allow our engineers carry out a detailed inspection of Aqueduct 174, Croxton Tank. 

Dukes Cut (Oxford Canal)

Date: January 31, 2024
Stoppages & Restrictions

Lock 44A, Dukes Cut Lock

Update on 31/01/2024:

CAUTION STREAM DECREASING

We advise users of all unpowered boats not to navigate and users of powered boats to navigate with caution.

River Soar

Start date: January 31, 2024
Est. end if know: March 31, 2024
Stoppages & Restrictions

Top Bridge approximately 500m below Pillings Lock

Update on 31/01/2024:

At Top Bridge, approximately 500m below Pillings Lock, on the River Soar there is a bank slippage.  The flood waters have washed back into the navigation and removed a 10m section of bank, where the debris is also encroaching on the towpath. 

We ask boaters to please pass this section with care while investigations are carried out and caution should also be taken when passing on the towpath.  

We will update this notice by the 31st March or as soon as we have further information.

Nottingham & Beeston Canal

Start date: January 31, 2024
Est. end if know: March 1, 2024
Stoppages & Restrictions

Meadow Lane -CSF

Update on 31/01/2024:

The shower and toilet block at Meadow Lane customer service facility on the Nottingham and Beeston Canal has been cleaned and repaired. 

However it will remain closed until Friday 1st March 2024, to prevent further vandalism due to anti-social behaviour.   

Water and elsan disposal remain available. 

Alternative solutions to improve security and maintain availability of the toilet and showers here are being considered.    

We will update this notice on the 1st March.

River Great Ouse

Date: January 31, 2024
Stoppages & Restrictions

DS Landing Stage Godmanchester Lock

ADVICE (Wednesday 31 January 2024 until rescinded)

Please be aware of a tree which is wedged against the DS landing stage at Godmanchester Lock.
We will look to have this tree removed as soon as it is safe and practical to do so. In the meantime please proceed with caution whilst in the area.

Macclesfield Canal

Start date: January 31, 2024
Est. end if know: February 14, 2024
Stoppages & Restrictions

Starts At: Bridge 87, Kent Green Bridge
Ends At: Lock 13, Hall Green Stop Lock

Update on 31/01/2024:

Our contractors have now successfully cleared silt from the site, this has allowed our teams to complete the necessary investigations of the culvert located in between Bridge 87, Kent Green Bridge and Lock 13, Hall Green Stop Lock on the Macclesfield Canal.

We will be undertaking works to re-line the culvert and the adjacent manhole to prevent leakage from the canal, the specialist materials required have been ordered and are scheduled to arrive next week, with work commencing from Monday 5 February.

We anticipate in the coming weeks a temporary ramp will be constructed to allow us to mobilise an excavator to facilitate the canal bed repairs.

Additional repairs to the towpath are required which will be carried out once the canal has been re-filled and the dams are removed, the towpath will remain closed until these works are completed.

A further update will be provided Wednesday 14 February.

Shropshire Union Canal

Start date: January 31, 2024
Est. end if know: February 1, 2024
Stoppages & Restrictions

Tree down

Bridge 41, Grub Street Bridge
Up Stream Winding Hole: Rue Hill
Down Stream Winding Hole: Norbury junction

Update on 31/01/2024:

Navigation is now open but restricted as there is lump of timber in the canal. Boats can still pass but please take care if passing. The contractors will clear the rest of the tree tomorrow.

NAVIGATION CLOSURE (12noon Tuesday 30 January 2024 until further notice)

A tree has fallen from the offside, blocking navigation by Bridge 41, Grub Street Bridge on the Shropshire Union Canal.

Our contractor has been informed. We’ll provide updates as soon as we receive them.


Advert
Get Towpath Talk newspaper delivered every month. Click here to subscribe.

Read Towpath Talk FREE online here.


Sell your boat here.