Network rail repairs to bridge
Starts At: Bridge 7A (Railway)
Ends At: Bridge 7A (Railway)
ADVICE (until 5pm Monday 26 June 2023)
Network Rail undertaking repairs to their structure.
Pontoon to be used in the first week for offside repairs.
Pontoon used in the second week for towpath diversion to allow repairs on that side.
Navigation to remain open at all times.