South of Top Lock. Between Lock 7 & 8 Wolverhampton
Up Stream Winding Hole: Junction with the Wyrley & Essington.
Down Stream Winding Hole: Junction with the Staffordshire & Worcester.
NAVIGATION CLOSURE (8am Monday 13 February until 4pm Friday 17 March 2023)
Update on 13/01/2023:
We have updated the location information on this stoppage. The work taking place will be between locks 7 & 8 which is further south of top lock than the notice currently suggests.
As this section was planned to be closed for these works and the gate replacement at Lock 5, we hope that this change causes minimal disruption.
Original message:
A stoppage is required to carry out repairs to the lock landing and waterway wall.