Start date: December 18, 2020

Est. end if know: March 23, 2021

Planned Stoppages

Bridge 54a, Junction of the Regent’s Canal, to Bottom Lock 3, Bow
Starts At: Lock 3, Bottom Lock
Ends At: Bridge 2, Grove Road Bridge
Up Stream Winding Hole: Bridge 54a, junction with the Regent’s Canal
Down Stream Winding Hole: Junction with the Lee Navigation

NAVIGATION CLOSURE (8am Monday 11 January until 4pm Monday 22 March 2021)

Update on 22/10/2020:

We would like to clarify details for this stoppage.

The Hertford Union Canal will be closed from Bridge 54a, the junction with the Regent’s Canal, to Bottom Lock 3.

Navigation on the Regent’s Canal will not be affected and boats will be able to turn at the junction, next to Bridge 54a.

Original message:

A stoppage is required on the Hertford Union Canal to enable detailed inspections and repairs of the waterway wall between the junction of the Regent’s Canal and Bottom Lock 3.

Navigation on the Regent’s Canal will not be affected.