Retaining Wall Repair
Starts At: Lock 50, Worksop Town Lock
Ends At: Lock 51, Worksop Bracebridge Lock
Updated 30/11/2023:
Canal and River Trust have now completed works to the collapsed retaining wall downstream of Worksop Town Lock.
The navigation has been cleared and made safe until a permanent repair of the retaining wall can be designed/constructed by a third party.
Navigation is now open.