Towpath Closure and mooring suspension
Starts At: Bridge 15
Ends At: Lock 15, Osier Bed Lock
Up Stream Winding Hole: Red House
TOWPATH CLOSURE (8am Monday 9 January until 5pm Friday 31 March 2023)
Towpath resurfacing and brickwork repairs to bridge 14.
The towpath will be closed from January 9th – March 31st
No moorings permitted within closed section of towpath.
Broughton lane car park will be closed for the duration of the works (this is being used as the site compound).