Binton Bridge, Welford Reach
RESTRICTION (Saturday 23 March 2024 until further notice)
Binton Bridge open to navigation with restricted width.
The bridge is open to navigation. However width of the navigation arch is reduced to 4.5m (14.8 feet) due to the temporary installation of steel braces. Fendering has been installed to protect boats.
Debris may be in the channel, either side or under the bridge so take great care.
Navigate with care, at slow speed and stay in the centre of the arch. Boats navigating downstream have right of way.
Scaffolding is installed on each side of and over the navigation arch. Booms are in place to keep boats away from the scaffolding on the non-navigation arches.