Aire & Calder Mainline/Wakefield Branch/Bank Dole Cut/Clarence Dock

by

Date: January 14, 2024
Time: 12:00 am
Stoppages & Restrictions

Intersection of: Lock 9, Castleford Junction Lock to Lock 11, Ferrybridge Flood Lock on Aire & Calder Navigation Main Line and
Bank Dole Lock (Lock 5) to Bank Dole Lock (Lock 5) on Bank Dole Cut and
Leeds Dock Flood Gates to Leeds Dock Flood Gates on Clarence Dock

Update on 14/01/2024:

All flood locks and gates are now open

Please check the Strong Stream Warning board and marker at each flood lock before entering the river section of navigation. 


Advert
Get Towpath Talk newspaper delivered every month. Click here to subscribe.

Read Towpath Talk FREE online here.


Sell your boat here.

Article Tags:

About the Author