Phase 1 and 2: Mooring suspension and towpath closure between Steel Road and Barretts Green Road 24.04.2023 – 25/07/2023 for installation of boater facilities towpath upgrades by Camway on behalf of OPDC
Starts At: Bridge 9, Acton Lane (B4492)
Ends At: Access Point
ADVICE (until Monday 25 September 2023)
Update on 24/08/2023:
The towpath diversion will now be in place from Barrett’s Green Road to Mcnicol Drive.
Update on 25/07/2023:
The date for the works to be completed has been extended until the 25th September
Original message:
MOORING AND TOWPATHS NOT CLOSED FOR FULL LENGTH OF WORKS. OVERALL CLOSURE FOR START OF WORKS – PHASED NOTICE FOR OPENINGS OF TOWPATH AND MOORINGS TO FOLLOW
Installation of boater facilities and towpath upgrades by Camway on behalf of OPDC. Towpath closure and Moorings shut intermittently between Steele Road and Barrett’s Green Road in phases with detailed short diversions on site signage.
Towpath diversion around Barrett’s Green Road and Steele Road