Aire & Calder Mainline/Wakefield Branch/Bank Dole Cut

by

Start date: September 27, 2023
End date: September 29, 2023
Time: 12:00 am – 12:00 am
Stoppages & Restrictions


Lock 9, Castleford Junction Lock to Lock 11, Ferrybridge Flood Lock on Aire & Calder Navigation Main Line and
Leeds Dock Flood Gates to Leeds Dock Flood Gates on Clarence Dock and
Bank Dole Lock (Lock 5) to Bank Dole Lock (Lock 5) on Bank Dole Cut

Update on 29/09/2023:

All flood locks and gates are open:

Ferry Bridge Flood Lock 

Castleford Flood Lock

Broadreach Flood Lock

Leeds Dock (Clarence Dock) Flood Gates

Bank Dole Flood Lock

Enjoy more Towpath Talk reading every month. Click here to subscribe.

Article Tags:

About the Author