Upper Trent

by

Start date: May 31, 2023
End date: June 16, 2023
Time: 12:00 am – 12:00 am
Planned Stoppages

Cranfleet Cut

Bridge 7, Railway Bridge

RESTRICTION (Thursday 15 June 2023)

Third party contractors, AMEY, will be carrying out an inspection on Railway Bridge 7 (Cranfleet Cut) on the Upper Trent on Thursday 15th June.

The bridge inspection will be undertaken from a small pontoon with aluminium scaffold tower, or from a ladder.

There may be delays of up to 30 minutes for passing craft to allow contractors to move their pontoon if it is restricting the navigation. Passing craft to navigate the location slowly, with caution and in single file.

Please follow any instructions on site. 


Advert
Get Towpath Talk newspaper delivered every month. Click here to subscribe.

Read Towpath Talk FREE online here.


Sell your boat here.

Article Tags:

About the Author