Starts At: Bridge 114A, Towpath Footbridge
Ends At: Bridge 114A, Towpath Footbridge
Up Stream Winding Hole: Wyvern Shipping
Down Stream Winding Hole: Slapton
TOWPATH CLOSURE (8am Tuesday 6 June until 5pm Friday 25 August 2023)
A 30m section of Towpath from bridge 114a (Towpath Footbridge) going south towards the bin store will be closed for the duration of works. 3 days whilst contractors install a 20m length of Coir Roll (bank protection) The Water Point, Elsan and Bin Store will remain open.
Visit Mooring – Leighton Linslade 14-day visitor Mooring – the remaining lengths will be open
Water Point – Open
Facilities (Bins) – Open
Elsan – Open
Please note, to assist with the coir installation, please move boat if requested by contractor.