Old Main Line

by

Start date: May 15, 2023
End date: May 28, 2023
Time: 12:00 am – 12:00 am
Planned Stoppages

Starts At: Broad Street Tunnel, Wolverhampton
Ends At: Mill Street Bridge

ADVICE (7am Monday 22 May until 5pm Friday 26 May 2023)

Contractors working on behalf of Network Rail are undertaking a visual and tactile inspection of Broad Street Tunnel and of the boundary wall along the towpath between Broad Street Tunnel and Mill Street Bridge.

A pontoon with a tower scaffold tower on will be installed in the water to facilitate the inspection of the tunnel. The canal will remain open and the pontoon will be moved manually with ropes to allow boat traffic when required. A ladder will be used to inspect the boundary wall along the towpath Signage and banksmen will be utilised to manage pedestrians and boaters.


Advert
Get Towpath Talk newspaper delivered every month. Click here to subscribe.

Read Towpath Talk FREE online here.


Sell your boat here.

Article Tags:

About the Author