Mooring Suspension for IWA Canalway Cavalcade
Starts At: Bridge 1C, St Marys Footbridge
Ends At: Bridge 3, Harrow Road (A404)
EVENT (7am Monday 24 April until 9pm Sunday 7 May 2023)
A mooring suspension is required between Harrow Road Bridge and St Marys Footbridge for the IWA Canalway Cavalcade festival.
This suspension is to allow boats and traders to arrive on site and allow for the set-up of the event.
It’s one of the largest waterways festivals in the country and an important tradition in the local community.
Boaters travel for miles to attend and the event attracts visitors from across London, and beyond