Fossdyke Canal/River Witham

by

Start date: April 7, 2023
End date: April 16, 2023
Time: 12:00 am – 12:00 am
Planned Stoppages

Between Wigford Way Road Bridge 8 – Fossdyke Canal and High Bridge 1 – River Witham

Intersection of: Bridge 8, Wigford Way Bridge Crossing to Bridge 8, Wigford Way Bridge Crossing on Fossdyke Canal and
Bridge 1 to Bridge 1 on River Witham

RESTRICTION (Friday 14 April 2023)

Third Party contractors, Northern Divers Ltd on behalf of Lincolnshire County Council,  are carrying out a dive survey in Lincoln city centre halfway between the two bridges: Wigford Way Road Bridge 8 on the Fossdyke canal and High Bridge 1 on the River Witham. These works are taking place on 14th April. 

The survey is required to assess the underwater condition of a waterside structure to inform the design of a Local authority emergency footpath repair. A Rib boat will be required by the divers and this will restrict the available navigation width. 

The affected footpath will be closed with a diversion in place, the opposite side towpath will remain open.

The navigation will remain open, but boaters may experience delays of up to 30 minutes, to allow contractors to move their boat out of the way. 


Advert
Get Towpath Talk newspaper delivered every month. Click here to subscribe.

Read Towpath Talk FREE online here.


Sell your boat here.

Article Tags:

About the Author