Paddington Arm (Grand Union Canal)

by

Start date: March 18, 2023
End date: May 24, 2023
Time: 12:00 am – 12:00 am
Stoppages & Restrictions

Bridge 17A, Northolt
Up Stream Winding Hole: Engineer’s Wharf Moorings, Engineers Wharf, Northolt
Down Stream Winding Hole: Bridge 15, Black Horse Bridge, Oldfield Lane, Greenford

Update on 21/03/2023:

The waterway is now clear and open

NAVIGATION CLOSURE (7pm Friday 17 March 2023 until further notice)

Bridge 17A, a local authority owned footbridge, has collapsed and has blocked the navigation. The towpath remains open via a short local alternative route. The local authority is determining how the bridge can be removed. 

Enjoy more Towpath Talk reading every month. Click here to subscribe.

Article Tags:

About the Author