Bridge 15, Elland Viaduct Inspection
RESTRICTION (8am-6pm Monday 13 February 2023)
An Inspection of bridge 15 Elland Viaduct is taking place from scaffold on a floating pontoon.
Skippers should slow down when approaching the bridge and be prepared to stop for up to 20 minutes if requested, whilst the pontoon moves out of the way.