Oxford Canal

by

Start date: January 14, 2023
End date: January 31, 2023
Time: 12:00 am – 12:00 am
Planned Stoppages

Dive Survey. 175m South of Bridge 240 (Aristotle Bridge)
Starts At: Bridge 240, Aristotle Bridge
Ends At: Bridge 242, Walton Well Road

RESTRICTION (8am-5pm Monday 30 January 2023)

Please be advised that a dive survey will be taking place and to approach with caution. Dive survey is to assess the condition of the offside waterway wall located between Bridge 240 and Bridge 242. Follow local signage and operational staff for further advice and guidance


Advert
Get Towpath Talk newspaper delivered every month. Click here to subscribe.

Read Towpath Talk FREE online here.


Sell your boat here.

Article Tags:

About the Author