Railway Bridge 131A
Starts At: Bridge 132
Ends At: Harecastle Tunnel North Portal
RESTRICTION (8am-6pm Monday 21 November 2022)
Third party contractors will be carrying out a detailed bridge inspection on behalf of Network Rail.
Depth measurements will be taken at the bridge and 30m upstream and downstream of the structure. A small boat will be used and workers will also be in the water.
Warning signs and banksmen will be used. Please approach with caution and be prepared to wait for workers to move out of the way.