Shropshire Union Canal

by

Start date: November 8, 2022
End date: December 7, 2022
Time: 12:00 am – 12:00 am
Planned Stoppages

Starts At: Bridge 134, Caughall
Ends At: M53 Bridge 135A

Update on 05/12/2022:

We are pleased to advise the towpath is back open between Caughall Bridge 134 to the M53 Bridge 135A, on the Shropshire Union Canal following completion of the towpath works.

Update on 14/11/2022:

Please be advised due to weather conditions works to surface the towpath will be delayed until 28th November

TOWPATH CLOSURE (7am Monday 21 November until 5pm Friday 2 December 2022)

Please be advised the towpath will be closed from Caughall Bridge 134 to the M53 Bridge 135A, this is to allow contractors to lay the top dressing surface of the towpath.  Once the surface is laid it needs time to set before the towpath can be re opened. 


Advert
Get Towpath Talk newspaper delivered every month. Click here to subscribe.

Read Towpath Talk FREE online here.


Sell your boat here.

Article Tags:

About the Author