Thames Tideway Post Inspections of Multiple CRT Bridges – Limehouse Basin, Limehouse Cut & Lee Navigation
Starts At: Bridge 9, Footbridge
Ends At: Bridge 1 (A12)
ADVICE (8am Monday 31 October until 5pm Friday 11 November 2022)
Bridgeway Consulting will be undertaking post construction inspections of multiple CRT bridges along the Limehouse Cut, Limehouse Basin and the Lee Navigation.
Inspections will be undertaken via work boat and small pontoon.
Towpath & Navigation will always remain unrestricted.