Canary Wharf Contractors as part of the Wood Wharf re-development are constructing 3 new residential buildings at Blackwall Basin
Bridge, Eastern Access Bridge
ADVICE (7am Monday 17 October 2022 until 6pm Sunday 30 April 2023)
To build F1 building – 52 storeys high a temporary cofferdam will need to be installed within Blackwall Basin. A new Dock sheet piled wall will also be installed in front of the new F2 building. There will also be constructed a new mooring site with pontoons and a promenade in front of the new buildings within Blackwall Basin. These works will not affect the navigation channel and the works site will be isolated from the Dock users with a demarcation Boom and silt curtain