Vegetation (including knotweed) removal as part of the Brentford Lock scheme via barge from offside
Bridge 208A (Railway)
ADVICE (9am Monday 5 September until Saturday 24 September 2022)
Please be advised that vegetation (including knotweed) removal will be taking place as as part of the Brentford Lock scheme. Two mooring bays have been suspended to allow barges to transfer material from the offside to the towpath side and into site