Pipe Bridge
Starts At: Bridge 15, Birches Head Lane
Ends At: Bridge 16, Red Hills Road Bridge
RESTRICTION (8am-6pm Tuesday 19 July 2022)
Third party contractors will be carrying out an inspection of the pipe bridge via roped access.
The canal and towpath will remain open but please approach with caution and be prepared to stop if requested.
Warning signs, banksmen and a safety boat will be used.