Bridge 147, Winkwell Swingbridge
RESTRICTION (6.15pm Saturday 30 April 2022 until further notice)
Due to a technical fault, Winkwell Swingbridge 147 is currently inoperable via customer console, and will be opened manually by Canal and River Trust operatives until the fault can be rectified.
The Bridge will be opened at 11AM & 3PM daily until further notice.